Measured Manager Log

2019-11-27 Migration to the new infrastructure

Keyelements of the new infrastructure :

  • The Manager runs with numerous improvements and bugfixes on a new virtual machine.
  • The Examinator now has a database cluster of three dedicated database servers and a load balancer available for storing the exam results.
  • The media are now stored on a separate media server.
  • The generation of the preview images and the examination booklets are generated by eight servers in parallel.

Measured Info Page